- Digital Marketing Agency ▪ Tampa FL
Low Voltage design services for a 60,000 sqft tenant improvement project.
- Hospitality/Transportation ▪ Miami FL
Data Center conceptual, schematic, feasibility study to consolidate eight data centers to two.
- Document Lifecycle Management ▪ Troy MI
Data Center project and design review for best practices, budget under/over runs, commissioning technology design and general findings and recommendations.
- Cellular Technology ▪ Tampa FL
Building Automation design to update data center management and monitoring for generators, ATS/switchgear, UPS, static switches, PDUs, RPPs, chiller plant, VFDs and CRACs. System required updating to take advantage of branch circuit monitoring.
- SaaS Software Development ▪ Austin TX
Responsible for program/project management, analysis, consulting and design for data centers and data center related projects. Program management to relocate a 5,500sqft SaaS hosted and enterprise data center to a 1,000 sqft co-location facility.
- Financial/Insurance ▪ Toronto ON
Project Manager and Infrastructure Consultant in an on-premise vs. SaaS hosted eGRC program.
- Property Development and Management ▪ Irvine CA
Project Manager and Senior Consultant for a WAN architecture re-design across 150 branch offices.
- Fortune 500 EPCM and Project Management ▪ Sugar Land TX
Project Manager for an application and network readiness assessment serving 43,000 users from a single data center.
- SaaS Software Development ▪ Austin TX
Project Manager for a network readiness assessment as a preliminary action prior to a data center relocation.
- Health System ▪ Altamonte Springs FL
Telecommunications and data center design/engineering for a 200,000 sqft building dedicated to Information Services group of a 55 hospital health system. Infrastructure and capacity planning for the 6,000 sqft data center in two phases. Analysis included a Computational Fluid Dynamics (CFD) study.
- Hospital ▪ Safety Harbor FL
Telecommunications design/engineering for a 15,000 sqft central utility plant.
- Health System ▪ Tampa FL
Telecommunications and medical communications design in a 21,500 sqft cancer center.
- University/Medicine ▪ Durham NC
Data center design/engineering for a 2,200 sqft data center in a new 580,000 sqft building. Also served as the construction administration telecommunications and medcomm representative.
- Hospital ▪ Tampa FL
Data center MEP/T planning of a 2,500 sqft space within a greenfield rehabilitation hospital compared to a central energy plant. Additionally, a metro Ethernet feasibility study to augment/replace existing communications services to reduce operating expenses.
- Health System ▪ Orlando FL
Secondary consultant for Telecommunications and medical communications design in a 306,000 sqft medical center.
- College ▪ Orlando FL
Telecommunications and data center design/engineering for a 60,000 sqft classroom and IT administration building including a 1,250 sqft data center.
- Health System ▪ Altamonte Springs FL
Telecommunications design/engineering for a 150,000 sqft corporate headquarters building.
- Health System ▪ Sayre PA
Overall assessment of long-term data center needs, including support systems investments, growth strategy and survivability. Needs assessment with staff to determine appropriate data center design mode. Support systems requirements included HVAC, electrical, fire protection, telecommunications, campus and outside plant entrances. The data center used the latest water-cooled cabinet technology for high-efficiency. Developed a cost opinion for owner-provided IT budget including racks, cabinets, power strips, KVM/IP, iLO, network and SAN switches. Detailed application uptime matrix documenting acceptable outage windows.
- Health Alliance ▪ Leesburg FL
Telecommunications and Data Center design/engineering for a 15,000 sqft IT administration building including a 1,200 sqft data center.
- Health System ▪ Nashville TN
Mechanical and Telecommunications schematic design of a 100,000 sqft purpose-built data center including 60,000 sqft of raised access flooring to be built in two phases.
- Community Hospital ▪ Boulder CO
MEP/T data center design/engineering of a 1,200 sqft in-place renovation. Included new UPS and in-row cooling with new telecommunications cabling replacement while data center remained operational.
- Health System ▪ Owensboro KY
Full design/engineering, assessment and master planning for a 3,500 sqft data center requirements. Needs assessment in the existing data center to evaluation HVAC, electrical capacity, fire protection, cabling and supporting infrastructure to establish Tier 2-3 reliability. Site feasibility and due diligence included two greenfield sites and one existing client-owned location for BC/DR use and/or alternates.
- Internet Co-Location Provider ▪ Nashville TN
MEP data center assessment of a 6,000 sqft space. Report specifically addressed capacity planning and infrastructure upgrades required for 50% expansion.
- Health System ▪ Ft. Myers FL
Data Center expansion of mechanical and electrical systems including flywheel system in place of typical batteries. Significant work included migration of single-corded IT equipment to dual-corded or the remediation and installation of rack-mounted automatic transfer switches.
- Regional Medical Center ▪ Newport News VA
Data center assessment of an existing 1,500 sqft space with mechanical, electrical, fire protection and communications systems to be relocated to a 3,500 sqft space. This included a schematic-level design with a relocation plan to continue to serve the existing systems, and then relocate the existing space to a disaster recovery site on another owner-owned campus.
- University ▪ Nashville TN
Data center scope review and assessment of a 5,000 sqft space with mechanical, electrical, fire protection and communications systems serving the research and academic needs of the University. The review included an additional 2,000 sqft in adjacent space. The report addressed standardization and conventions as well as operational best practices. The new design recommendations included traditional cooling methods as well as in-row water-cooled systems with air-side economizers.
- Children's Hospital ▪ Miami FL
Full design/engineering and project lead of assessment, due diligence for mechanical, electrical, plumbing, fire protection and communications systems of a 1,100 sqft facility co-located in a central energy plant building. Follow-on projects included a complete re-stack and replacement 14 Telecommunications Rooms in the main hospital with a new replacement data center.
- Health System ▪ New Orleans LA
Needs assessment of data center using design capacity, historical data and growth projections based on geographic location, space, mechanical, electrical, fire protection and communications requirements accounting for technology infrastructure growth.
- Health System ▪ Knoxville TN
MEP/T assessment of a 5,000 sqft data center. Budgeting, cost opinions, site feasibility and due diligence included two existing client-owned locations.
- University ▪ Baltimore MD
Participated in quality assurance and review of a Tier-2/3 due diligence to relocate a 1,300 sqft data center to one of four locations.
- Health Plan ▪ Temple TX
Assessment of long-term data center and technology infrastructure needs with a focus on an on-campus containerized data center solution vs. an in-building typical design. Assessment included comparison of containers vs. in-building along with numerous recommendations for technology standards and conventions Developed a cost opinion for all-inclusive owner-provided IT equipment.
- Medical Center ▪ Jupiter FL
A Tier-3 data center expansion to total 1,900 sqft to adjacent space while maintaining uptime of existing data center. As the prime consultant, included MEP, fire protection, communications and a Computational Fluid Dynamics (CFD) study confirming 300% growth over current demand load. Developed a cost opinion for owner-provided IT budget including racks, cabinets, power strips, KVM/IP, iLO, network and SAN switches.
- Department of Transportation ▪ Nashville TN
Data center and applications assessment in preparation to two consolidated 15,000 sqft data centers.
- Health System ▪ Tampa FL
Owner's technology consultant and data center construction advisor for 7,500 sqft data center. Responsible for technology infrastructure deployment, wrote/managed RFPs for equipment/components, provided cost avoidance, project management, construction leasing contracts, estimated and designed technology infrastructure, basis of design with technical requirements and a CFD study.
- Insurance ▪ Nashville TN
Data center expansion facility and data center architect for global data center consolidation, adding 1,500 sqft to an existing 3,500 square foot facility. Scope included moving and migrating SAN data from London to Nashville TN. Managed contractor's project schedule and IT deployment.
- Cellular Technology ▪ Tampa FL
Corporate Headquarter Relocation to 200,000 sqft facility. Advise and recommend site location, selection, design and relocation of employees. Renovation and tenant improvement, including 7,000 square foot data center and computer labs. Managed a team of 20 technology consultants deploying new networking, storage and communications infrastructure. Designed and deployed a data center specific building management system using Modbus and TCP/IP.
- Financial/Brokerage ▪ New York NY
Provided development of corporate enterprise and production network design standards and project plan to consolidate three data centers to a newly renovated 20,000 sqft data center. Managed four consultants to determine network infrastructure design as well as application migration strategies.
- BioMedical Research ▪ Cambridge MA
Project Manager of nine consultants to deploy 1,200 employees in a 750,000 sqft four-building campus over a two-year schedule. Owner's technology consultant/representative providing RFP management and communications contractor management.
- Mutual Insurance ▪ Springfield MA
Veritas Design and Implementation using multiple media managers across a WAN. Security assessment for 150 Solaris, HP-UX, and AIX hosts.
- Internet Venture Holding Company ▪ London, England
Planned and designed connectivity for a 20,000 sqft multi-floor managed and co-location facility.
- Internet Service Provider ▪ Andover MA
Designed and deployed communications infrastructure for a 50,000 sqft data center as Owner's technology consultant.
- Medical Group ▪ Charlestown MA
Local resource for a national Novell NetWare upgrade/consolidation/migration that was temporarily postponed due to lack of planning. The engagement was re-scoped as a significant data collection collaboration and resource inventory that lead to the upgrade/consolidation/migration less than two months later.
- Media/Record Retention ▪ Boston MA
OSPF Design Review and Recommendations in preparation for a future acquisition which nearly doubled the size of the existing organization.
- Insurance ▪ Portland ME
Managed migration from AT&T to MCI Frame Relay network with ISDN dial-backup for 40 domestic sites. Logistical management of equipment, configuration thereof, cut-over and decommissioning process.
- Internet Service Provider ▪ Burlington MA
Managed networking and communications infrastructure for a 10,000 sqft data center and remotely supported 11 data centers.